{"id":7508,"date":"2023-01-29T14:22:00","date_gmt":"2023-01-29T14:22:00","guid":{"rendered":"https:\/\/www.topcable.com\/blog-electric-cable\/?p=7508"},"modified":"2025-02-18T13:48:29","modified_gmt":"2025-02-18T13:48:29","slug":"top-cable-uses-100-green-energy","status":"publish","type":"post","link":"https:\/\/www.topcable.com\/blog-electric-cable\/top-cable-uses-100-green-energy\/","title":{"rendered":"Top Cable uses Green Energy"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>All the electricity Top Cable consumes in its Spanish factories and installations comes from Green Energy sources.<\/strong><\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img decoding=\"async\" src=\"data:image\/gif;base64,R0lGODlhAQABAIAAAAAAAP\/\/\/yH5BAEAAAAALAAAAAABAAEAAAIBRAA7\" data-src=\"https:\/\/www.topcable.com\/blog-electric-cable\/wp-content\/uploads\/2024\/02\/self-consumption-1024x596.jpg\" alt=\"Green energy\" class=\"wp-image-19797 lazyload\"\/><noscript><img decoding=\"async\" width=\"1024\" height=\"596\" src=\"https:\/\/www.topcable.com\/blog-electric-cable\/wp-content\/uploads\/2024\/02\/self-consumption-1024x596.jpg\" alt=\"Green energy\" class=\"wp-image-19797 lazyload\" srcset=\"https:\/\/www.topcable.com\/blog-electric-cable\/wp-content\/uploads\/2024\/02\/self-consumption-1024x596.jpg 1024w, https:\/\/www.topcable.com\/blog-electric-cable\/wp-content\/uploads\/2024\/02\/self-consumption-300x175.jpg 300w, https:\/\/www.topcable.com\/blog-electric-cable\/wp-content\/uploads\/2024\/02\/self-consumption-768x447.jpg 768w, https:\/\/www.topcable.com\/blog-electric-cable\/wp-content\/uploads\/2024\/02\/self-consumption.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/noscript><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 ez-toc-wrap-left-text counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<label for=\"ez-toc-cssicon-toggle-item-6a6b63dee214c\" class=\"ez-toc-cssicon-toggle-label\"><span class=\"ez-toc-title\" style=\"cursor:inherit\">INDEX<\/span>\n<span class=\"ez-toc-cssicon\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #444444;color:#444444\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #444444;color:#444444\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/label><input type=\"checkbox\"  id=\"ez-toc-cssicon-toggle-item-6a6b63dee214c\" checked \/><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.topcable.com\/blog-electric-cable\/top-cable-uses-100-green-energy\/#top-cable-an-environmentally-friendly-company\" >TOP CABLE, AN ENVIRONMENTALLY FRIENDLY COMPANY<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.topcable.com\/blog-electric-cable\/top-cable-uses-100-green-energy\/#green-energy-at-all-production-centers\" >GREEN ENERGY AT ALL PRODUCTION CENTERS<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.topcable.com\/blog-electric-cable\/top-cable-uses-100-green-energy\/#reducing-environmental-impact-with-green-energy\" >REDUCING ENVIRONMENTAL IMPACT WITH GREEN ENERGY<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"top-cable-an-environmentally-friendly-company\"><\/span>TOP CABLE, AN ENVIRONMENTALLY FRIENDLY COMPANY<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This action is aligned with its <a href=\"https:\/\/www.topcable.com\/blog-electric-cable\/en\/solar-self-consumption-becomes-a-strategic-axis-for-top-cable\/\" target=\"_blank\" rel=\"noreferrer noopener\">#movingreen Strategic Sustainability Plan<\/a> to transform the company into a Company that is increasingly respectful of the Environment, which is based on four pillars:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Use of renewable energies<\/li>\n\n\n\n<li>Recycling of all materials used in the production chain<\/li>\n\n\n\n<li>Reduction of energy consumption (in particular fossil fuel consumption)<\/li>\n\n\n\n<li>Sustainable packaging and logistics<\/li>\n<\/ul>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-7387b849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:250px\"><\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Solar self-consumption in all Top Cable Production Centres\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/nUHE3TAjoI8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:250px\"><\/div>\n<\/div>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"green-energy-at-all-production-centers\"><\/span>GREEN ENERGY AT ALL PRODUCTION CENTERS<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>headquarters in Rub\u00ed (Barcelona)<\/strong> is equipped with more than 4,500 panels covering two facilities, with a total capacity of 2.0 MW and an annual energy production of 2,490 MWh. The <strong>Sallent (Barcelona) facilities<\/strong> have surpassed 10,500 installed solar panels. These are distributed across 3 buildings and generate a total capacity of 4.2 MW, producing an annual energy of 4,779 MWh. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In <strong>Bellpuig (Lleida)<\/strong>, there&#8217;s a covered facility with 3,208 installed panels generating a total capacity of 1.3 MW and producing 1,516 MWh of energy annually. Finally, the solar <strong>self-consumption project in<\/strong> <strong>Binaced (Huesca)<\/strong> is being consolidated. It has recently started operating partially, generating 0,6MWp. The project&#8217;s capacity will reach up to 842 kWp, projected to maximize the performance of this installation.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table style=\"border-width:1px\"><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Type<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Ubication<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Buildings<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Power capacity<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Annual energy (MWh)<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Solar panels<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Rooftop<\/td><td class=\"has-text-align-center\" data-align=\"center\">Top Cable Rub\u00ed (Barcelona)<\/td><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">2,0 MWp<\/td><td class=\"has-text-align-center\" data-align=\"center\">2.490<\/td><td class=\"has-text-align-center\" data-align=\"center\">4.580<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Rooftop<\/td><td class=\"has-text-align-center\" data-align=\"center\">Top Cable Sallent (Barcelona)<\/td><td class=\"has-text-align-center\" data-align=\"center\">3<\/td><td class=\"has-text-align-center\" data-align=\"center\">4,2 MWp<\/td><td class=\"has-text-align-center\" data-align=\"center\">4.779<\/td><td class=\"has-text-align-center\" data-align=\"center\">10.689<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Rooftop<\/td><td class=\"has-text-align-center\" data-align=\"center\">Top Cable Bellpuig (Lleida)<\/td><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">1,3 MWp<\/td><td class=\"has-text-align-center\" data-align=\"center\">1.516<\/td><td class=\"has-text-align-center\" data-align=\"center\">3.208<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">PV Plant<br>(first phase)<\/td><td class=\"has-text-align-center\" data-align=\"center\">Top Cable Binaced (Huesca)<\/td><td class=\"has-text-align-center\" data-align=\"center\">&#8211;<\/td><td class=\"has-text-align-center\" data-align=\"center\">0,6 MWp<\/td><td class=\"has-text-align-center\" data-align=\"center\">696<\/td><td class=\"has-text-align-center\" data-align=\"center\">1.233<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>TOTAL<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>6<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>8,1 MWp<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>9.481<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>19.710<\/strong><\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\">Green energy statistics at all production centers<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"reducing-environmental-impact-with-green-energy\"><\/span>REDUCING ENVIRONMENTAL IMPACT WITH GREEN ENERGY<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">MovingGreen\u00ae, which looks ahead to the year 2030, responds to the Company&#8217;s firm conviction of the importance of reducing in full measure the environmental impact. &#8220;With the MovingGreen\u00ae initiative, we are making a decisive step towards the consolidation of the &#8220;green spirit&#8221;, that has always allowed Top Cable&#8217;s actions&#8221; highlights <strong>Jordi Parera, President of Top Cable<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This initiative is mainly based on four concepts: the use of green energy, the recycling of all materials used in a production chain and the reduction of energy consumption (especially in the case of <a href=\"https:\/\/en.wikipedia.org\/wiki\/Fossil_fuel\" target=\"_blank\" rel=\"noreferrer noopener\">fossil fuel<\/a> consumption) and providing sustainable packaging and logistics.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>All the electricity Top Cable consumes in its Spanish factories and installations comes from Green Energy sources. TOP CABLE, AN ENVIRONMENTALLY FRIENDLY COMPANY This action is aligned with its #movingreen Strategic Sustainability Plan to transform the company into a Company that is increasingly respectful of the Environment, which is based on four pillars: GREEN ENERGY [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":22285,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[588],"tags":[],"class_list":["post-7508","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-top-cable-en"],"_links":{"self":[{"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/posts\/7508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/comments?post=7508"}],"version-history":[{"count":21,"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/posts\/7508\/revisions"}],"predecessor-version":[{"id":27882,"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/posts\/7508\/revisions\/27882"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/media\/22285"}],"wp:attachment":[{"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/media?parent=7508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/categories?post=7508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.topcable.com\/blog-electric-cable\/wp-json\/wp\/v2\/tags?post=7508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}